Flat RoofRestoration
Restore your existing roof for up to 70% less than a full replacement. No demolition, no downtime.

Versus a full tear-off and replacement.
Service life of the applied membrane.
Workmanship warranty.
Your facility keeps operating throughout.
Why restore instead of replace.
Full replacement isn't the only option for a flat roof past its first cycle.
Capital preserved.
Restoration costs up to 70% less than a full replacement, extends the service life of an asset you already own.
Engineered to outperform.
A seamless, liquid-applied membrane bonds directly to the existing substrate. Rated for extreme thermal cycling and heavy foot traffic.
Facility keeps running.
The building stays in production during application.
Technical specifications.
Every number below is measured on the applied membrane, not on the drum. These are the properties you'd hand a structural engineer.
- Surface weight
- 0.76 lb/sq ft
- Dry film thickness
- 0.08 in
- Temperature range
- −22 → +194 °F
- Rain-proof
- 90 minutes
- Fully cured
- 4 hours
- Certification
- W3-E certified

Solar ready.
Restoration and rooftop photovoltaics are not mutually exclusive. Our system is engineered to sequence with your PV plan — whether the array is proposed, existing, or already producing.

Before PV installation.
Restore first, then mount the array on a warranted membrane with a fresh 25-year service life underneath it.
Beneath live arrays.
Our crews work around and beneath operational PV systems.
“Disposing of just 10,000 sq ft of flat roofing generates as much debris as tearing down a two-story house.”
Questions from facility teams.
A full renovation strips the roof back to the deck, replaces insulation and membrane, and disposes of everything removed. Restoration keeps the existing build-up in place and bonds a seamless liquid-applied membrane over it. When the substrate is structurally sound, restoration delivers comparable performance for up to 70% less cost, with the building fully operational throughout.
It handles thermal cycling from −22°F to +194°F, is rain-proof in 90 minutes, fully cured in 4 hours, weighs only 0.76 lb/sq ft, and carries W3-E certification.
Yes. The system can be installed before a new PV array goes up, applied after an existing array is temporarily lifted, or worked around and beneath operational arrays.
Crews work in sections, so the building stays open and operational throughout the project. The coating is odor-neutral and low-emission, which is why it is used on production floors without pulling people off the space below. Most jobs are complete in days.
Yes, 10,000 sq ft.
Request a quote.
- Phone
- +1 (818) 284-8765
- Hours
- Mon–Thu 8AM–4PM · Fri 8AM–3PM
- HQ
- Los Angeles, CA · Nationwide
- Minimum
- 10,000 sq ft
